Container
Terminal
: |
|
|
Location
:
Northwest
side of
the
basin |
|
|
Quay
length :
450
Meters
extendible
to
750
Meters. |
|
|
Stacking
Yard :
32.5
Ha. |
|
|
Handling
equipment
:
|
|
|
|
3 Gantry container cranes |
|
8 RTG's (5+1) |
2 Reach Stackers |
|
2 Top Pick/Reach-stackers |
|
|
|
Annual
through
put
capacity
:
400,000
TEY |
|
General
Cargo
Terminal
: |
|
|
Location
:
Northeast
side of
the
basin |
|
|
Quay
Length :
300
Meters |
Yard
Area :
17.5 Ha. |
|
|
Handling
Equipment
: |
|
|
|
3 General Cargo Cranes |
|
Forklifts (Various Sizes) |
|
2 Transit warehouses : 4000 M2 each |
|
2 Gold stores : 200 M2 each |
|
5 Ha. of open storage space |
|
|
|
Annual
throughput
capacity
: 2
Million
TONS |
|
Bulk
Terminals
: |
|
|
Location
:
Southeast
side of
the
Basin |
|
|
Quay
Length :
450
Meters |
Stocking
Yard :
16 Ha. |
|
|
Handling
Equipment
: |
|
|
|
2 Bulk gantry cranes of 40 TONS Hoisting Capacity |
|
Belt-Conveyor system (2400 TPH) to the stockpiles |
|
2 Stackers/Reclaimers with a capacity of 2400 TPH each |
|
Bulk loader for export of DRI/HBI |
|
|
|
Daily
Discharge
Capacity
:
35,000
Tons of
bulk
cargo |
|
|
Annual
throughout
capacity
:
Approximately
6
Million
TONS |
|
Fertilizer
Terminal
: |
|
|
Location
:
Southwest
side of
the
basin |
|
|
Quay
Length :
300
Meters |
Yard
area :
10
Ha. |
|
|
Storage
capacity
:
Warehouse
of
30000
TONS |
|
|
Annual
Throughout
:
400,000
/
650,000
TONS |
|
Tank
Frame : |
|
|
Location
: Liquid
&
Chemicals
& Oil
storage |
|
|
Southwest
side of
the
basin |
|
|
Storage
:
150,000
-
200,000
CBM |
|
|
Yard
area :
100,000
M2 |
|
|
Leading
arms and
associated
infrastructure |